|
| |
Back |
|
| |
Welcome to CANNANORE LIGHT HOUSE
|
|
|
 |
|
|
|
Directorate of Lighthouses & Lightships, Cochin20 |

|
| MASTER LEDGER |
| CANNANORE LIGHTHOUSE |
|
|
1. |
Name |
: |
CANANNORE |
2. |
Sr.No (in A.L.O.L) |
: |
0672 |
3. |
Position |
: |
Lat |
11° 52.5’ N |
Lon |
75° 21.4’ E |
4. |
Elevation |
: |
35 m |
5. |
Characteristic |
: |
Fl.W.10Sec |
|
Tel No. 0497-2707838 |
6. |
Range in N miles |
|
(i) |
Luminous |
: |
18.8 NM |
|
(ii) |
Geographical |
: |
16.6 NM |
7. |
Lighthouse Tower |
|
(i) |
Type |
: |
Circular RCC tower |
|
(ii) |
Height |
: |
23 m |
|
(iii) |
Colour Scheme |
: |
Red and White bands |
8. |
Optical Equipment |
(a) |
Optic |
|
(i) |
Make |
: |
- |
|
(ii) |
Size |
: |
187.5mm,Vth Order Revolving |
|
(iii) |
No of panels |
: |
4 panels |
|
(iv) |
Area of dioptric portion |
: |
1256 cm2 |
|
(v) |
Area of catadioptric portion |
: |
- |
|
|
Total Corrected Area |
: |
1256 cm2 |
|
(vi) |
Divergence |
: |
|
|
(i) |
Horizontal |
: |
12o13’03’’ |
|
(ii) |
Vertical |
: |
18o19’35’’ |
|
(vii) |
Duration of flash |
: |
2.04 Sec |
(b) |
Pedestal |
: |
Ball Bearing Type |
(c) |
Rotation device |
: |
Dual stepper motor (20 Kg/cm2 cap) |
(d) |
RPM |
: |
1.5 |
(e) |
Illuminant |
: |
Cluster of 3 Nos150W/230V Metal Halide Lamps |
(f) |
Effective beam intensity |
: |
69750 Candela |
|
|
9. |
Lantern |
|
(i) |
Diameter |
: |
2.4 m |
|
(ii) |
Height of Glazing |
: |
1.4 m |
|
(iii) |
No of panels |
: |
12 Nos |
|
(iv) |
Ventilators |
: |
5 Nos |
10. |
Energy source |
|
(i) |
Local Mains |
: |
Main supply 440 V, 3 Æ, 50 Hz KSEB |
|
(ii) |
Emergency |
: |
Battery back up 12 V, 150AH |
|
(iii) |
Stand By |
: |
Genset 5 KVA, 220 V, 1 Æ, 50 Hz |
11. |
Details of UPS |
Sr No |
Make |
Type |
Capacity |
Input |
Output |
Qty |
1 |
Celtron |
Off line |
500VA |
12Vdc |
230Vac |
5 Nos |
12. |
No of Generator set |
: |
One |
| |
Details of Diesel engine |
Sr No |
Engine |
Make |
Type |
No. of cylinders |
RPM |
HP |
Cooling |
1 |
20.1123/0200210 |
Kirloskar |
TA1 |
1 |
1500 |
6 |
Air |
|
Details of Alternator |
Sr No |
Serial No |
Make |
KVA |
Volts |
Hz |
Phase |
RPM |
1 |
0200500955 |
Kirloskar |
5 |
230 |
50 |
Single |
1500 |
13. |
Automatic voltage stabilizer |
Sr No |
Make |
Type |
Capacity |
Input |
Output |
Qty |
1 |
AE |
EMS 10 |
12.5 KVA |
180-250V |
230V |
One |
2 |
Solar Stabilizer |
Servo |
5 KVA |
90-260V |
230V |
One |
14. |
Batteries |
Sr No |
Where Used |
Qty |
Type |
Make |
Volts |
Amp-Hr |
(i) |
Engine Start |
1No |
Lead acid |
Exide |
12 |
120 |
(ii) |
Stepper Motor |
1No |
Lead acid |
Exide |
12 |
150 |
(iii) |
UPS |
3 Nos |
Lead acid |
Exide |
12 |
150 |
|
|
|
15. |
Battery Charger |
Sr No |
Make |
Volts |
Capacity |
Qty in Nos |
1 |
Dimmer stat type |
0-24 Volt |
25 Amps |
1 No |
16. |
Fire Fitting Equipments |
S No |
Equipment |
Type |
Capacity |
Qty |
1 |
Fire Extinguisher |
Foam Type |
9 Liter |
3 Nos |
2 |
Fire Extinguisher |
DCP type |
9 Liter |
2 Nos |
3 |
No of Sand Buckets |
- |
- |
2 Nos |
4 |
No of Water Buckets |
- |
- |
2 Nos |
17. |
Communication |
: |
Telephone No 04972707838 |
|
|
Intercom provided between Service room, Power house & Head light keeper’s quarters |
18. |
Water Supply |
: |
Cantonment Board Cannanore |
19. |
Land |
|
(i) |
Area |
: |
0.833468 Hectare |
|
(ii) |
Demarcation |
: |
Masonry Compound Wall |
|
(iii) |
No of fruit bearing trees |
: |
50 Nos |
|
(iv) |
No of non –fruit bearing trees |
: |
3 Nos |
|
|
|
|
|
20. |
Building |
:
|
Office Room & General Store Room (1No), Inspection quarters (1No) One HLK quarters ,Two ALK quarter sand one LHA Qtr & one safaiwala quarters |
21. |
Type of compound wall |
: |
Brick Masonry Compound Wall |
22. |
Street Lighting |
: |
7 Nos Street Light Poles& 2 nos in office building |
23. |
Staff |
: |
HLK (Sr) |
- 1No |
|
|
|
ALK( Sr) |
- 2 No |
|
|
|
LHA |
- 1No |
|
|
|
Safaiwala |
- 1No |
|
|
|
|
|
24. |
Mode of approach |
: |
By rail up to Cannanore & by road 3 Km up to Lighthouse |
|
|
25. |
Facilities available |
: |
Police Station, Post Office, Dispensary and High School, all are within 3 Km from LH. |
26. |
Postal address |
: |
Head Light Keeper,
Cannanore Lighthouse,
Near Govt Guest House,
Bernachery P. O,
Cannanore, Pin 670013 |
27. |
Cost of construction |
: |
Rs 15,57,775/- |
28. |
Cost of Equipment |
: |
Rs 3,02,153/- |
29. |
Date of Commissioning |
: |
25.07.1976 |
30. |
Remarks |
|
|
(i) |
Conversion from PRB 42 to MH lamp |
: |
20.08.2005 |
(ii) |
Commission of direct drive equipment |
: |
20.08.2005 |
|
| |
The Lighthouse is situated within the municipality limits of Cannanore city. Cannanore is an important Railway station on Mangalore-Shoranur section. The Lighthouse is about 3 km away from the Railway station.Cannanore was a flourishing Port under Malabar ruler Samuri ( Zamorin ) in 15th century.The port had maritime links with Madras, Colombo, Tuticorin, Alleppey, Mangalore, Bombay and Karachi. The Portuguese lead by Vasco Da Gama landed first at Kapad beach near here in1498. They built Fort St. Angelo in the early 16th century at the southern end of the town. Two century later the region came under the British control. They established a cantonment at Cannanore in 19th century.
The Fort served as a prominent land mark. In 1843 a system of hoisting a lantern with oil wick lamp was introduced. A masonry pedestal was constructed in 1903 on the rampart of the fort and a double wick oil lamp inside the 4th order dioptric lens and lantern with arrangement for occultation was placed on this pedestal. The light used to be available during fair seasons only – September to May. In 1924 some improvements took place. The light was shifted in 1939 on to a 16m steel trestle erected on the northern bastion of the Fort. The equipment was replaced by a flashing light with 10 sec character working on DA gas in 1948. This light remained in operation till the new Lighthouse Tower was constructed at the present location during 1975-76.
The PRB-42 equipment with 6V 30W `C’ type sealed beam lamps, supplied by M/s. J. Stone India, Calcutta, was installed on this tower. The lighthouse was commissioned into service on 25th July 1976. The 2.4m diameter GI lantern house fabricated at Cochin was installed at the station and the `C’ type sealed beam lamps were replaced by `D’ type sealed beam lamps on 31st May 2003. |
|
|
|
|
|